Construction of a 4 MW solar electric generation facility that will be sited on a previously disturbed 23-acre parcel consisting of a former wastewater facility in Yuma County, Yuma, Colorado.
Staff Assignment Name: Maria Tur
Project Submittal Date: 3/27/2025
Project Approval Date: 4/3/2025
DOE CE Applied: B5.16