Cape Hatteras Electric Cooperative
- Notice of Availability of Environmental Assessment Adoption, Supplement, and Recirculation - August 2017 – 21 kB
- RUS Adoption and Supplement to EA - August 2017 – 10.8 MB
- NC 12 Replacement of Herbert C. Bonner Bridge (Bridge No. 11) EA - May 2010 – 19.6 MB